Archive for January, 2012

Offshore Wind – Still Tricky

Posted in Engineering, Even Stevie Wonder Saw That Coming with tags , , , on January 20, 2012 by awickerman

Round about a year ago I noted the Offshore Wind Accelerator scheme trying to overcome the problems of deep water offshore wind being tricky and noted that in addition to the problems they were trying to solve there would be;

the dozens of other problems they haven’t even thought of yet, because as I said at the top; Offshore Wind – Tricky.

Well one of those other problems has just popped up – scour. The turbine foundations are surrounded by large armour stone blocks and these are sinking, up to 1.5m in some cases, as the sea washes away the sea bed beneath the stones. As the report says;

Lead author Anders Nielsen says the sinking stones are a real problem as they can, ‘reduce the stability of the monopole and change for instance the natural frequency of the dynamic response of an offshore wind turbine in an unfavourable manner.’

To be fair I’m sure it will be solved, in the short term just dropping more stones down every few months will do it, but I’d be very surprised if the solution doesn’t end up being making each turbine more expensive to install, which is probably the last thing an already very expensive form of power needs. Still when was renewable energy ever about providing the consumer with cheap and reliable electricity?

Advertisements
%d bloggers like this: